China & Nuclear Power Stations Construction Projects

China & Nuclear PowerStations Construction Projects

 

 

Who = Peoples Republic of China’s State Nuclear Power Technology Company (SNPTC) has recently selected the Westinghouse/Shaw Consortium and Westinghouse’s AP1000 passive Generation III technology as the basis for four nuclear power plants

The AP1000 Consortium will be working closely with Energy Recruitment Solutions in the  implementation of the new build program with positions and assignments.

As part of the AP1000 Consortium, Shaw provide engineering, procurement, commissioning, and management services for the four Chinese nuclear generation units.

We have an ongoing need for staff to fulfill this large scale demand for professional skilled and educated construction and engineering experts.  We have positions across all disciplines within construction and Engineering for long term ex pat staff positions near Shanghai.

 

We would like to hear from candidates with recent & current experience in construction engineering of Nuclear Power Stations across the world.

Experience from Ukraine, Romania, South Africa ,Sweden, Slovenia Bulgaria ,Finland, Russia, Lithuania ,India, slovakia, france Canada  & China.

Why= With the fastest growing economy in the world and its population aggressively demanding to catch up with the western world.  Huge demand is placed on the shoulders of the PRC to enable businesses to operate across its vast lands.

With an enormous percentage of its population still living off the land and largely still existing without mains electricity. You have another demand for upgrading the national infrastructure to support the businesses and as the population that converts to working within its factories is looking to emulate its western counterparts.

Wages enable independence better quality of life with improved towns and buildings.

Mainland China already has eleven nuclear power stations in commercial operation with a further six under construction, and plenty more in the planning stages about to start construction.  China needs more Nuclear reactors if it is to continue its vertical climb in world wide dominance.

The countries rapid expansion in its growth of commercial and industry factories leads not only to national power shortages but also a heavy reliance on Fossil fuels that as a direct result is also a big impact on health and its smog related effects on the nation.

More Why China has to reduce its carbon foot print as its the second-largest contributor to energy-related carbon dioxide emissions after the USA.

Nuclear power is a natural choice to support the required power capacity in the coastal areas remote from the coalfields and where the economy is developing quickest

Where  Shanghai and north and south at Sangmen and Haiyang.

 

 

At the end of February 2007 a framework agreement was signed between Westinghouse and SNPTC specifying Haiyang in Shandong province  as the site of the second pair of AP1000 units, with Sanmen.

In July 2007 Westinghouse, along with consortium partner Shaw, signed the AP1000 contracts with SNPTC, Sanmen Nuclear Power Company, Shangdong Nuclear Power Company and China National Technical Import & Export Corporation (CNTIC). There were no specific terms released however figures of $5.3 billion for the deal have been widely quoted.

The Sanmen site works commenced in February 2008 and full construction for unit 1 is to start in March 2009, with the first power expected late in August 2013. 

Its is widely acknowledged that EDF will take a 30% share in the Taishan project as joint venture partner with CGNPC.

We understand that the Taishan Nuclear Power Company which will oversee the building, then own and operate the plant.  Cost is estimated for the project, including fuel supply, to total in excess of 8 billion Euros.  The Steam turbine generators alone will cost circa 300 million Euros

5 Responses to “China & Nuclear Power Stations Construction Projects”

  1. 206 Central Heights Dr.
    Home Phone: 770.838.4454
    Carrollton, GA. 30116
    Cell Phone: 256.452.2965
    Email: babbsengineering@hotmail.com

    Professional Summary
    More than 15 years of experience in the field of civil engineering.  Background includes construction management of roadway projects, environmental studies, and also hydraulic designs for roadway and civil site projects.  Knowledgeable of roadway and civil site projects from preliminary stages to final design.

    Professional Experience
    02/07-12/08 Black & Veatch, Inc
    Civil Site Lead Engineer
    ESBWR nuclear power plant in the state of Louisiana and Michigan:
    The project scope was to research and validate all concerns from the Nuclear Regulatory Commission pertaining to all surface water impacts that could be encountered during the pre and post construction activities of an ESBWR nuclear power plant.
    Fermi III Project -Detroit , Michigan:
    Civil Site Lead Engineer in developing the Environmental Report and Final Safety Analysis Report for the COLA.
    Responsible for development and production of all the hydrology, water resource, and civil site sections within both the ER and FSAR documents, overall the documentation consisted of nearly 20 to 25% of both documents.
    The COLA of Fermi 3 has been accepted by NRC and can be seen on NRC website http://www.nrc.gov/reactors/new-reactors/col/fermi.html.
    Supported by 2 Jr. Engineers, 3 to 4 cad technicians, an oceanographer to complete project.
    In correspondence with environmental, geotechnical and mechanical engineers as well concerning technical data for Fermi 3.
    Riverbend Project- South Louisiana:
    Reviewed ER and FSAR civil engineering documents as QC/QA for the sections relative to water resources and civil site design.
    Mountstorm:
    Wind Turbines Layout with roadway design x-sections and profiles of roadway developed.
    Assisted by cad technician to complete project.
    Weston Project:
    West Texas assisted Project Manager concerning revision of driveway Entrance to Power Plant
    Maui Hawaii:
    Assisted Project Manger in developing Estimate for construction of roadway to support wind turbines Wind Turbines
    JEA Northside Project:
    Assisted Project Manager on resizing storage Pond onsite due to site expansion.
    Aquila:
    Smithville Missouri Driveway Entrance to Power Station
    Plant Crist:
    Florida Power and Light Project Driveway Entrance to Power Plant Site, additionally designed spillway driveways
    Spruce Project Unit 2:
    Design civil site drainage system using AutoCAD, terramodel and drainage software’s.

    Tucson Electric Power and Light:
    Springville Project designed 2 – 25 million gallon capacity storage ponds.
    Spruce Project Unit 2 San Antonio Texas:
    This particular project consisted of matching proposed underground storm drainage with Unit 1( existing Power Plant) as well as assuring the additional storm surface water runoff would not have a negative impact on surrounding drainage structures.
    In order to assure no negative impact there was drop inlets and unique storm pipe layout designed as well as slope paved ditch used as an outlet source that flowed to an existing pond that was located near the new site.
    Civil site design work on clean coal power plants in Texas: 
    The project scope was to design site drainage to assure storm-runoff during rainfall event. 
    Drainage analysis performed using modern software to secure pipe and inlet structures on site.
     
    11/05-02/06 Carr and Associates Inc
    Civil Design Engineer
    Caffee Creek Subdivision, Bibb County, AL:
    Hydraulic Engineer- Project Scope consisted of Phase I and II of an III (3) Phased Project, which consisted of streetscape, sanitary, storm and drainage design for 100 of the 220 residential site. 
    Demolition to existing building and also proposed roadway was implemented in Phase I of this project. 
    A full hydrology and hydraulic analysis was done on this project, a drainage map, existing and proposed drainage analysis and report, erosion and sedimentation report, BMP controls was implemented within the plans of this project. 
    Rational Method for Q100, Q50, Q25, Q10, and, Q2 rainfall data pertinent to the undeveloped site. 
    FHWA Hydrain software was used to validate storm drains and Flowmaster was used to evaluate inlets throughout the site. 
    AutoCAD 2000 and Eaglepoint was used for street alignments, profiles, and cross-sections.

    07/02-11/05 Khafra Engineering Consultants, Inc
    Project Engineer 
    Widen Level and Resurface County Roads 12 & 9 from Middletons to US Highway 80, Lowndes County, AL: 
    The project scope was to resurface both county roads with Improved Bituminous Asphalt Plant Mix. 
    County Road 9 also required a widening each lane one (1) foot which increased the two existing ten (10) feet lanes to eleven (11) feet.
    Leveling Mix was used on both roadways to enhance vehicle travel conditions. 
    The pavement was resurfaced with 429B-212(binder) and 429A-206(wearing surface). 
    The length of both roadways totaled 11.44-miles, County Road 9 having a roadway length of 8.72 miles and County Road 12 having a roadway length of 2.719 miles. 
    C&I were performed in accordance with ALDOT standards.
    Resurfacing and Traffic Stripe US 80, Lowndes County, AL:  
    The project scope was to resurface US 80 with Improved Bituminous Asphalt Plant Mix. 
    Roadway was resurfaced with 424B-281(binder) and 424A-281(wearing surface). 
    The entire 6-mile section eastbound on a 4-lane divided highway was planned and paved according to ALDOT standards and assure Quality Control and Quality Assurance on asphalt material used on project. 
    The Total project cost was about 7.5 million.
    Bridge Replacement (Bridge Culverts) On Perdue Road At Three Run Creek And On Reed Road At Avinger Branch East Of Fort Deposit, AL: 
    The project scope was to replace existing bridges with bridge culverts. 
    The existing bridge on Perdue Road and Reed Road was replaced with one three (3) barrel bridge culvert at each site.
    The clearing and grading procedures as well as the testing of all materials was in accordance with the construction plans as well as State and FHWA Specifications. 
    Traffic Control and Erosion and Sediment Control layouts were according to MUTCD and ADEM specifications.
    City of Pritchard Community Center, Prichard, AL:
    Hydraulic Engineer- Project Scope consisted of full scale design of 5300 square foot building on 2-acre undeveloped site. 
    The parking lot details, utility relocation, driveways, curb inlets, and storm sewers were designed in accordance with the City of Prichard Storm Water Drainage Ordinance. 
    The water surface profile and drainage analysis was evaluated on this project site using the Rational Method for Q100, Q50 and Q25 rainfall data pertinent to the undeveloped site. 
    The existing and post design conditions was evaluated.

    06/01-03/02 Lowe and Associates Inc
    Senior Roadway Design Engineer
    Forum at Peachtree Parkway, Peachtree City, GA:
    Senior Roadway Project Engineer- Project Scope consisted of adding one 11.0’ lane and 5.5’ wide sidewalk and 2.0’ wide bike trail on an existing 4-lane in an urban area.
    The added features will allow pedestrians the opportunity to enjoy the scenery along the park area surrounding this roadway as well as relieve traffic congestion during special events.
    Harrisonburg Crossing Roadway Improvements, Harrisonburg, VA:
    Senior Roadway Project Engineer-   Project Scope consisted of widening existing 4 lanes by adding an additional 11.0’ lane as well as turning lane and driveway improvements to accommodate for civil site construction of Home Depot Facility within a newly developing industrial park area. 
    Utility relocation and storm sewer improvements as well as public safety enhancements.
    Gulf stream Road, Chatham County- Savannah GA:
    Senior Roadway Project Engineer-   Project Scope consisted of 2-lane widening and resurfacing as well as drainage improvements along roadway. 
    The enhancements designed on this particular area allowed better stability of roadway to handle heavy vehicles as well as prevent flood problems during Q50 storm.
    Erosion & Sedimentation Control & Comprehensive Monitoring Plan Greene County:
    Project Manager- Project Scope consisted evaluating Lake Oconee impact on Cold Springs Rd. (existing dirt road) that was going to be widened to two (2) 10.0ft.wide lanes paved with surface treatment. 
    The size of existing cross-drains were evaluated and redesigned to current G.D.O.T. specifications as needed. 
    Erosion & Sedimentation layout was implemented in the set of plans according to G.D.O.T. specifications.
      
    12/93-05/01 Alabama Department of Transportation
    Project Engineer 
    Underground Storage Tank Removal, Hwy 21, and Munford/Oxford, AL:  
    The project scope consisted of the removal of old underground storage tanks from old gas stations along Hwy 21 between Munford and Oxford. 
    The procedure for removal of the tanks had to meet the environmental standards set by EPA, ADEM and state specifications. 
    Grade and drain Project, Hwy 21 Munford/Oxford, AL: 
    The project scope was adding two additional 12.0 foot wide lanes with a 10.0 foot outside shoulder and a 6.0 foot inside shoulder. 
    Existing culverts were extended and new culverts were constructed where needed. 
    The project also required on bridge to be constructed over Salt Creek.  Roadway pipes and manholes were constructed according to Plans as well as State and FHWA Specifications. 
    Traffic Control and Erosion and Sediment Control layouts were according to MUTCD and ADEM specifications.
    The Total project cost was about 7.5 million.
     
    Education
    94, B.S. in Civil Engineer
    Auburn University, Auburn AL 

    Training and Certifications
    Professional Engineering License Alabama 2007
    Alabama Bridge Certification 2006
    Qualified Credentialed Inspector 2003
    Re-Certification Hazwoper 2002
    Worksite Erosion & Sediment Control Certification 2001
    Hazwoper Certificate 2001
    Concrete Technician Re-Certification 2001  
    E.I.T. Certification October 28, 2000
    Asphalt Technician Certification 1997
    Nuclear Gauge Certification 1997
    Traffic Control Technician Certification 1997
    Concrete Technician Certification 1996

  2. I am interested in construction supervisor or management positions. I can travel anywhere.
    If you have any positions please email.
    email address paedae5@bellsouth.net
    thank you Don C. Paedae

  3. Please email me of any jobs available
    email address paedae5@bellsouth.net

  4. To discuss this or similar Nuclear Contractor Jobs and Contracts, please contact Simon Turner of ERS on +44(0)1454 203 460, or submit a CV to cv@energyrs.co.uk, to register your general interest, or apply to for this position, or for other Nuclear Projects or Atomic Power Plant Sites, of which further details are available at http://www.ERSJobs.net
    http://www.nuclear-energy.co.uk

  5. To discuss this or similar Nuclear Contractor Jobs and Contracts, please contact Simon Turner of ERS on +44(0)1454 203 460, or submit a CV to cv@energyrs.co.uk, to register your general interest, or apply to for this position, or for other Nuclear Projects or Atomic Power Plant Sites, of which further details are available at http://www.ERSJobs.net

    http://www.nuclear-energy.co.uk

Leave a comment